amsterdam
Exhibition Stand Builder in Amsterdam
Almost every major trade fair in Amsterdam runs at one venue: RAI Amsterdam, on Europaplein in the south of the city. Metstrade used all 13 RAI halls for the first time in 2025. IBC returns every September, and water, food, fintech and horticulture shows fill the months in between. Many exhibitors at those shows fly in, and their stands are shaped by RAI's rules and the organiser's manual long before the first concept. That's where Design Desk starts.

Serving brands across Europe
















Exhibition stand design and build for RAI Amsterdam
Whether you’re showing at the RAI for the first time or returning to the same hall each year, every project starts with the same three steps:
- Check the organiser’s manual and RAI’s rules for your hall and plot.
- Design around the conversations and products the stand has to handle.
- Plan production and installation backwards from your build-up slot.
Our service portfolio includes:
Custom exhibition stands: Built for one show and one plot. At IBC that might mean a demo-led stand with screens on several open sides; at PLMA, a compact stand with sample displays and a quiet table for buyers.
Modular exhibition stands: For exhibitors who return to the RAI every year or tour other European shows. One system is reconfigured for each plot and refreshed with new graphics.
Design from our own studio: 10 designers develop several concepts against your brand guidelines and floor plan, so you choose between real options.
One project manager: The same person runs concept development, design rounds, production planning, the build-up schedule and on-site support.
Production through long-standing partner suppliers: Your project manager coordinates their work and checks it at every stage.
Structural specifications for raised and multi-level stands: Covering materials, dimensions and load, to support your permit application.
Double-decker stands: Planned from the first sketch around RAI’s permit process for anything above 60 cm and the organiser’s height limit for your hall.
Last-minute stands: For shows where the plot came through late or a supplier dropped out. Modular is usually the realistic route on a short timeline
A stand at the RAI is judged in a few seconds from the aisle, but it’s decided months earlier, in the brief. Our job is to get the early decisions made while they’re still easy to change.
OUR PROCESS
How we build your stand
01
Consultation
Tell us your goals and requirements and we’ll create designs that truly reflect them.
02
Design
Sit back as our team matches the design to your goals and identity.
03
Approval
Review our drafts and share your feedback—we’ll refine until it’s just right.
04
Construction
Our craftsmen build with top-quality materials for durability and impact.
05
Show Days
We handle the setup, installation, and dismantling at your venue, so you can focus on the exhibition.
What to plan for when you exhibit at RAI Amsterdam
RAI publishes its stand rules online in English, and several of them change a design before anything is drawn. These are the ones worth confirming first.
Points to confirm first:
The height limit is 275 cm unless your organiser says otherwise: RAI’s standard stand types allow a maximum construction height of 275 cm, and for most of them that includes the wooden platform. Stands in the Passage are limited to 200 cm. Organisers then set their own limits in the exhibitor manual, and these can differ from the venue standard in either direction.
Anything above 60 cm needs a permit: A second storey, a stage or a grandstand higher than 60 cm falls under the Dutch Housing Act. Applications go through the show’s webshop to RAI’s Permits Desk with drawings and construction calculations, and an external expert agency may assess the structure. That makes a double-decker a first-conversation decision.
A multi-storey stand is inspected twice: RAI’s permit specialist checks it during build-up, while the structure is still open, and again before it’s first used, with the focus on stairs and railings. Both inspections belong in the build-up schedule from day one.
A raised floor changes your entrance: RAI’s accessibility guidelines ask for a sloped edge at least 1 m wide on floors under 5 cm, a ramp at least 1 m wide where the floor sits 20 cm above the aisle, and stairs at every main entrance above 22 cm. A platform added for cabling can take space from your entrance, so it’s drawn in from the start.
When a show fills the RAI, everything nearby is in demand: Metstrade used all 13 halls for the first time in 2025, and IBC uses 14 halls or more. In those weeks, build-up slots, freight access and hotel rooms near Europaplein all compete for the same window. Book your build-up team’s accommodation when you book the plot.
Getting there is quick, so plan arrivals around your build-up slot: Trains from Schiphol reach Amsterdam RAI station in about 10 minutes, and metro 52 stops at Europaplein, in front of the venue. A team landing on build-up day can be at the venue soon after arrival, which helps when slots are tight.
Showing at Rotterdam Ahoy or Jaarbeurs Utrecht instead? Our exhibition stand builder in the Netherlands page covers the other Dutch venues.
PRICING GUIDE
A solution for every budget
Think of exhibition stand design like choosing a travel class – every option gets you to the destination, but the journey, comfort, and impression you leave are entirely different.
Simple, functional, and neat - a perfect starting point.
Smart Exhibition Foundations
- Direct flooring
- Standard / modular structures
- 2D graphics & logos
- Stock lighting & furniture
- Simple eyecatchers
- TV screens
Upgraded materials and design elements that lift overall impact.
Everything in Economy, and
- Raised flooring
- 3D logos & lightboxes
- Premium/ suspended eyecatchers
- Taller / customized elements
- Enhanced options & effects
- More AV options
High impact stands with custom elements that turn heads.
Everything in Premium Economy, and
- Premium options
- Elaborate / complex constructions
- High impact features
- Wider premium selection
- Elaborate eyecatchers
- High tech multimedia
What you get when you work with Design Desk
Most RAI projects that go wrong do so in the schedule, not the drawing. This is how we keep yours on track.
What distinguishes our service:
One project manager, start to finish: The person who takes your brief is the person you call during build-up, so nothing is lost in a handover.
Several concepts from 10 designers: You compare distinct options and get further design rounds without extra charges.
The permit question asked first: If your stand needs a raised floor or a second level, we raise RAI’s 60 cm threshold on the first call, while there’s still time to apply.
Structural specifications once the concept is approved: Materials, dimensions and load, ready to support the application to RAI’s Permits Desk.
Space planned for meetings: At shows like Money 20/20 and PLMA, much of the business happens sitting down, so we plan seating and private space before display walls.
On-site build support: Problems during build-up need a decision on the floor, not an email chain. Build support is provided on site during installation.
One contractor across Europe: With 2,500+ projects in 31+ countries, a show at the RAI can be one stop in a wider programme.
Start with a free proposal
PROJECT SHOWCASE
BREAKBULK EUROPE 2026
Air Charter Services
18 sqm, Stand no. H2.4-E73
Concept Note
The stand combines a raw industrial look with the warmth of a modern lounge. Concrete-style walls, timber flooring, green turf, pallet seating and a steel drum table create visual contrast, while warm festoon lights and greenery soften the space.
The use of timber, metal and textured finishes adds depth, giving the stand a relaxed, characterful feel that suits the Breakbulk setting.
Why choose Design Desk for your exhibition in Amsterdam
Fresh designs that command attention
Single point solution provider
SMB-friendly pricing
Design Desk started in 2005 because too many capable companies were settling for stands that looked like every other stand in the hall. 21 years and 2,500+ projects later, the approach hasn’t changed: fresh design work from a team large enough to give you real choices, at a price that works for growing businesses.
Our complete capability encompasses:
Scale: 2,500+ projects for 300+ clients across 30+ countries.
Speed: A free 3D stand visualisation within 4 to 7 working days of your brief.
Choice: A team of 45+ people, including 10 designers who develop multiple concepts against your brand guidelines and floor space.
Production: Partnerships built over 21 years, coordinated by your project manager.
Technical support: Structural specifications for multi-level stands, covering materials, dimensions and load.
Flexibility: Project structures that work across a range of budgets, timelines and stand sizes.
SERVICES
Types of exhibition stands
Custom
Custom exhibition stands create unique brand experiences with creative designs, functional layouts, and premium finishes for every event.
Modular
Modular exhibition stands offer flexible, reusable solutions that are easy to assemble, transport, and adapt for multiple exhibitions.
Double-Decker
Double-deck exhibition stands maximize floor space while creating a strong visual impact with dedicated areas for meetings.
Planning a show at RAI Amsterdam?
Tell us the show, your hall, your plot size and what the stand needs to do. You’ll have a free 3D visualisation within 4 to 7 working days.
TESTIMONIALS
Don’t just take it from us
Here’s what our clients have to say
It was an amazing experience working with Design Desk, everything was perfectly organized.
Swarupa Das
Executive Manager
Ram Krishna Forgings Limited
IAA
A big thank you for the great design and your dedication! It was a great pleasure to work with you!
Team Seichter
Team Seichter GmbH
Seichter GmbH
Tire Technology Expo
From start to finish, the experience was excellent. The stand design, the build quality, & the overall finish were all delivered at a very high standard.
Otto Andersson
Managing Director
Greensteps
E-World
Thank you for your great work in Frankfurt. Hope this was the first booth out of so many others in 2026 and beyond.
Rex Lau
CEO
Golden House Products
Frankfurt Buchmesse
They (Design Desk) were always prompt in their responses, attentive to our needs, and very professional. The materials used were top-notch, and the attention to detail in the construction and final setup of the booth was exceptional.
Simona Dodero
Tourism Marketing Key Account
The Mall Luxury Outlets
ILTM Cannes
Awesome job team! Thanks so much for your help in ensuring we have a great show.
Olivia Allen
Marketing
Pax2Pay
ITB
The overall experience with Design Desk was great, the booth looked nice and the team on-site was also very supportive.
Martina Chao
Marketing Manager
Grade Refrigeration
Fruit Logistica
Thank you so much for your excellent support & design. We are very happy with the result.
Alex Scasny
Sales & Marketing Director
Plateau International
ILTM Cannes
You all delivered a fantastic product - I had people say it looked AI in our photos! I appreciate the partnership, proactiveness, and the attention to detail from your team.
Kathleen Sledge
Communications & Marketing Manager
Tricon Energy
K Show
FAQs
How fast can we turnaround your project, and other common questions
How do I choose an exhibition stand builder in Amsterdam?
Ask three things before you compare portfolios:
- Whether they’ve read your organiser’s manual and RAI’s rules for your hall.
- Whether one named project manager stays with you from brief to dismantling.
- Whether the quote separates the stand build from space rental, RAI services and freight.
Our guide to the questions to ask an exhibition stand builder covers the rest.
Do RAI Amsterdam's height limits differ by hall?
Yes. RAI’s standard limit is 275 cm for most stand types, but stands in the Passage are limited to 200 cm, and the walkway to Hall 8 allows either 275 cm or 245 cm. Organisers can set their own limits too, so check the exhibitor manual for your show and hall.
When does a stand at the RAI need a permit?
When it includes a second storey, a stage or a grandstand higher than 60 cm. The application goes through the show’s webshop to RAI’s Permits Desk, and the structure is inspected during build-up and again before first use. We prepare the structural specifications the application relies on, and your project manager builds the deadlines into the schedule.
Does a raised floor at the RAI need a ramp?
Often, yes. RAI’s guidelines ask for a ramp at least 1 m wide where the stand floor sits 20 cm above the aisle, and stairs at main entrances above 22 cm. Below 5 cm, a sloped edge at least 1 m wide is enough.
How far in advance should we appoint a stand builder for a show at the RAI?
4 to 8 months before the show. That leaves room for concept design, design rounds, a permit application if you need one, and production. For Metstrade or IBC, when the whole venue is busy, aim for the earlier end.
What does an exhibition stand in Amsterdam cost?
Stand build costs are quoted per square metre:
- Economy: EUR 350 to 500
- Premium Economy: EUR 500 to 700
- Business Class: EUR 700 and above
Space rental, RAI services, freight and travel sit outside those figures.
Does your team speak Dutch?
Our team manages your project from brief to dismantling, with clear communication throughout. RAI’s regulations and permit guidance are available in English, making it easier to coordinate requirements and approvals with the venue.
Can the same stand go to shows in Germany afterwards?
Yes. Most of our work happens in Germany, including Anuga and The Tire Cologne at Koelnmesse, ITB Berlin and InnoTrans at Messe Berlin, and Interzoo in Nuremberg. A modular stand can move between the RAI and German venues with new graphics each time.
Our show is only a few weeks away. Can you still help?
Often, yes. A late start narrows the options, usually towards modular, and rules out a second storey once the permit window has passed. Send us the show, hall and plot size, and we’ll tell you what’s realistic.
What do you need from us to get started?
The show and hall, your plot number, dimensions and open sides, your budget range and what the stand needs to achieve. That’s enough for a first concept.