circle image dd

The Hague

Exhibition Stand Builder in The Hague

img_vector

In The Hague, most exhibitions sit inside international congresses. World Forum, the former Nederlands Congresgebouw, hosts meetings in engineering, mathematics, medicine and cybersecurity, with 12,000 m² of exhibition space where industry stands meet delegates between sessions. In 2027 it hosts OMAE and ICIAM, and the city's trade fairs, such as LAB-SUPPLY, run at the Fokker Terminal. Congress stands work with tighter rules than trade fair halls: lower height limits, short build windows and deliveries through a freight lift. As an exhibition stand builder in The Hague, Design Desk designs within those limits from the first sketch.

Serving brands across Europe

Exhibition stand design and build for World Forum The Hague

Whether you’re exhibiting at an engineering congress or a medical event, every project follows the same three steps:

  1. Read the organiser’s exhibition manual: height limit, deadlines and delivery route.
  2. Design around the conversations, demos and samples the stand has to handle between sessions.
  3. Plan production, delivery and installation backwards from a short build-up window.

Our service portfolio includes:

  • Custom exhibition stands: One design for one congress and one plot. At OMAE that might mean a compact stand with a scale model and a screen for engineers; at a medical congress, a demo screen and a quiet table for one-to-one conversations.

     

  • Modular exhibition stands: Many international congresses move to a new host city each edition. One system follows you there, reconfigured for each plot and refreshed with new graphics.

     

  • Last-minute stands: For congresses where the space was confirmed late or a supplier dropped out. Modular is usually the realistic route on a short timeline.

     

  • Design from our own studio: 10 designers develop several concepts against your brand guidelines and floor plan, so you choose between real options.

     

  • One project manager: The same person runs concept development, design rounds, production planning, the build-up schedule and on-site support.

     

  • Production through long-standing partner suppliers: Your project manager coordinates their work and checks it at every stage.

     

  • Structural specifications for platforms and larger structures: Covering materials, dimensions and load, to support the organiser’s approval of your plans.

     

  • An English-speaking team: Our team works in English from brief to dismantling, the working language of most international congresses.

A congress stand gets a few coffee breaks to make its point. Fresh design makes it in seconds, within a low height limit.

circle image dd

PORTFOLIO

We help brands like yours stand out

circle image dd

OUR PROCESS

How we build your stand

st-1

01

Consultation

Tell us your goals and requirements and we’ll create designs that truly reflect them.

Edit-Icon

02

Design

Sit back as our team matches the design to your goals and identity.

exhibition-stand-services

03

Approval

Review our drafts and share your feedback—we’ll refine until it’s just right.

Setting-and-Deliver-Icon

04

Construction

Our craftsmen build with top-quality materials for durability and impact.

Cart-Icon

05

Show Days

We handle the setup, installation, and dismantling at your venue, so you can focus on the exhibition.

What to plan for when you exhibit at World Forum The Hague

World Forum is part of GL events and reopened in 2017 after a renovation of more than EUR 28 million that added a 3,500 m² exhibition area. As a congress venue, it handles stands differently from a trade fair hall. These are the points to confirm before anything is drawn.

Points to confirm first:

    •  
  • The congress organiser writes the rules. Each congress publishes its own exhibition manual, and the limits are often tighter than at a trade fair. At ESPE 2023 at World Forum, for example, self-build stands were capped at 2.5 m including platforms, anything at that height had to sit 1 m back from open edges, and multi-storey stands were not permitted. Ask for your manual when you book.

  • Everything comes in through a freight lift. The same manual lists the interior logistics route at a maximum of 2.90 m high and 3.00 m wide, and the freight lift at 2.10 m high and 2.60 m wide. Goods were limited to 300 kg per m². Stand walls, counters and graphics are designed in sections that fit through.

  • Docks suit trucks, not the car park. Docks 1 and 4 take trucks up to 4.10 m high and 3.10 m wide, including 18 m trailers; Docks 2 and 3 take vehicles up to 3.75 m high. Vehicles leave as soon as they’re unloaded, and the parking garage has a 2.00 m height limit, so a crew van carrying stand parts can’t park underneath.

  • Build windows are short. At ESPE 2023, space-only contractors had a day and a half, every stand had to be finished by 19:00 the evening before opening, and breakdown ran from closing time to 23:00 the same day with no storage. A stand that assembles quickly from labelled sections is the safe choice.

  • Paperwork comes early. That congress wanted stand plans about 3.5 months before opening, then a risk assessment, proof of EUR 5 million public liability insurance and a fire conformity declaration. Contractors had to be named in advance and carry photo ID, and every delivery went through the official logistics partner. Your project manager builds deadlines like these into the schedule from day one.

  • Getting there from Schiphol. Direct trains run from inside Schiphol to Den Haag Centraal in about 30 minutes, every 15 minutes. From there, tram 1 stops at World Forum, about a 5-minute walk from the entrance, and bus 28 stops 180 m away. By car, the venue is close to the A12 and A44.

Showing at RAI Amsterdam or Rotterdam Ahoy instead? Our Amsterdam page covers the RAI, and the Netherlands page covers the other Dutch venues.

circle image dd

PRICING GUIDE

A solution for every budget

Think of exhibition stand design like choosing a travel class – every option gets you to the destination, but the journey, comfort, and impression you leave are entirely different.

Simple, functional, and neat - a perfect starting point.

Smart Exhibition Foundations

Upgraded materials and design elements that lift overall impact.

Everything in Economy, and

High impact stands with custom elements that turn heads.

Everything in Premium Economy, and

What you get when you work with Design Desk

A congress stand has a few coffee breaks to start the right conversations, a tight build window and a manual full of deadlines. This is how we handle all three.

What distinguishes our service:

  • One contact in English, start to finish: The person who takes your brief is the person you call during build-up, and the whole project runs in English.

  • The manual read first: Height limit, delivery route and paperwork deadlines go into the first conversation, not the last week.

  • Built for the freight lift: Walls, counters and graphics are designed in sections that fit a 2.10 m lift and assemble quickly.

  • Space for real conversations: Delegates have minutes between sessions, so we plan where people stand, sit and talk before we plan display walls.

  • A stand that travels with the congress: A modular system follows you to next year’s host city, with new graphics each time.

  • Several concepts from 10 designers: You compare distinct options and get further design rounds without extra charges.

  • One contractor across Europe: With 2,500+ projects in 31+ countries, The Hague can be one stop in a wider programme of congresses and trade fairs.

Start with a free proposal






    Why choose Design Desk for your exhibition in The Hague

    Fresh designs that command attention

    Single point solution provider

    SMB-friendly pricing

    Design Desk started in 2005 because too many capable companies were settling for stands that looked like every other stand in the hall. 21 years and 2,500+ projects later, the approach hasn’t changed: fresh design work from a team large enough to give you real choices, at a price that works for growing businesses. Design Desk B.V. is registered in Amstelveen, the Netherlands.

    Our complete capability encompasses:

      • Scale: 2,500+ projects for 300+ clients across 31+ countries.

      • Speed: A free 3D stand visualisation within 4 to 7 working days of your brief.

      • Choice: A team of 45+ people, including 10 designers who develop multiple concepts against your brand guidelines and floor space.

      • Production: Partnerships built over 21 years, coordinated by your project manager.

      • Technical support: Structural specifications for multi-level stands, covering materials, dimensions and load.

      • Flexibility: Project structures that work across a range of budgets, timelines and stand sizes.

         

      • Work in the Netherlands: We designed the Air Charter Services stand at Breakbulk Europe 2026, Rotterdam Ahoy. 
    circle image dd

    SERVICES

    Types of exhibition stands

    Custom

    Custom exhibition stands create unique brand experiences with creative designs, functional layouts, and premium finishes for every event.

    Modular

    Modular exhibition stands offer flexible, reusable solutions that are easy to assemble, transport, and adapt for multiple exhibitions.

    Double-Decker

    Double-deck exhibition stands maximize floor space while creating a strong visual impact with dedicated areas for meetings.

    Last-Minute

    Last-minute exhibition stands provide quick and reliable setup solutions without compromising quality, branding, or presentation.

     
     

    Exhibiting at a congress or trade fair in The Hague?

    Tell us the show, your hall, your plot size and what the stand needs to do. You’ll have a free 3D visualisation within 4 to 7 working days.

    Exhibition Stand
    circle image dd

    TESTIMONIALS

    Don’t just take it from us

    Here’s what our clients have to say

    circle image dd

    FAQs

    Questions about building an exhibition stand in The Hague

    Ask three things before you compare portfolios:

    • Whether they’ve read your congress’s exhibition manual and planned for the freight lift.
    • Whether one named project manager stays with you from brief to dismantling.
    • Whether the quote separates the stand build from the stand fee or sponsorship package, venue services and freight.

    Our guide to the questions to ask an exhibition stand builder covers the rest.

    Mostly at World Forum, the city’s largest congress and event venue, where industry exhibitions run alongside international congresses. Some trade fairs, such as LAB-SUPPLY, use the Fokker Terminal.

    Each congress sets its own limit in the exhibition manual. At ESPE 2023, for example, self-build stands were capped at 2.5 m including platforms. Ask for your manual when you book.

    Rarely. Congress exhibitions usually rule them out, and ESPE 2023 did not allow multi-storey stands at all. Check your organiser’s manual before planning a second level.

    Through the loading docks and a freight lift. One congress manual lists the lift at 2.10 m high and 2.60 m wide, and the interior route at 2.90 m by 3.00 m, so large pieces are designed in sections that fit.

    Often not long. At ESPE 2023, space-only contractors had a day and a half, and breakdown had to finish by 23:00 on closing day. We design for quick assembly from the start.

    4 to 8 months before the event, and earlier for congresses, whose plan deadlines can fall around 3.5 months before opening. For OMAE on 13 to 18 June 2027, that means starting by mid-February 2027. For ICIAM in July 2027, start by mid-March. For LAB-SUPPLY in February 2027 it’s already late, so talk to us about modular and last-minute options.

    Stand build costs are quoted per square metre:

    • Economy: EUR 350 to 500
    • Premium Economy: EUR 500 to 700
    • Business Class: EUR 700 and above

    The stand fee or sponsorship package, venue services, freight and travel sit outside those figures.

    Yes. A modular stand can be reconfigured for the next edition’s plot, for other Dutch venues, or for German venues like Koelnmesse, where our projects include Anuga and The Tire Cologne. New graphics keep it fresh each time.

    Often, yes. A short timeline usually points to a modular stand, and anything that needs organiser approval may be off the table once the plan deadline has passed. Send us the event, your stand number and size, and we’ll tell you what can still be done.

    The event, your stand number, dimensions and open sides, the exhibition manual if you have it, your budget range and what the stand needs to achieve. That’s enough for a first concept.

    Scroll to Top